Tessera
Project overview
Challenge
The client had a concept and a demo date. There was no drawing package, no supplier list and a payload that kept changing.
Approach
We froze the interfaces first, then built the chassis around a bolt pattern that could carry any payload the client might choose.
Solution
A five-piece aluminium chassis with a standard payload plate, delivered with a full drawing package and a build guide.
Results
- 5
- 9 wk
- 100%
Cadence
